Surface preparation
Surface preparation
Bottom moraine
WPC flooring is weathering resistance, but
they should not be directly laid on the wet ground.
Optimal is the laying of the compacted
gravel base or solid concrete base in for gravel foundation to compress the
first gravel 15-20 cm high layer using a vibrator. The extra 5 cm thick layer
of sand is advantageous for concrete panels, which are in place with the rubber
hammer taps and must be aligned so that they form a precise alignment of the 2%
slope (from the house). The maximum value of the distance between the concrete
slabs is 400 mm (center to center). In this now is the child that you
previously cut into the appropriate length, the central design of the address
bar. The position field shall be laid at the angle of 90 degrees to the
required direction of the deck.
Concrete base
If you have a
plan, concrete solid foundation, then you can directly with the installation of
the base of the start. At the beginning, with the size of the child, the
address bar is seen only to the desired length as the lower structure support,
flat washers used in different thickness. Place gasket at 400 mm (center to
center) maximum distance, thus with 2% gradient, guaranteed from home. Now, the
PED position of the flat washer is centrally designed. The position field shall
be laid at the angle of 90 degrees to the required direction of the deck.
WPC deck laying
Simple assembly
The lower part
is clean, laying the foundation of unified WPC. You have parallel supporting
beam, each substructure in balance, you can start laying the first plank,
general information: please pay attention to every step, the WPC plastic
materials should be pre drilled. Tip: set the cordless screwdriver from the
minimum torque, in order to avoid speeding. The first line of the board: to
solve this problem, first provide countersunk screws into the initial assembly
folder address bar (Figure 1). Drill for the previous address bar, pay
attention to not over tighten the screws to ensure that "training".
Once the clip is in all position bars, slide to the first thick board (Figure
2). The board further lines: the first normal erection clip, now can be
inserted, and then after drilling, also twisted (Figure 0.3). In this clip
insert series now under the board. In accordance with the corridor aisle
(Figure 4).
WPC deck laying
Simple assembly
The lower part is clean, laying the foundation
of unified WPC. You have parallel supporting beam, each substructure in
balance, you can start laying the first plank, general information: please pay
attention to every step, the WPC plastic materials should be pre drilled. Tip:
set the cordless screwdriver from the minimum torque, in order to avoid
speeding. The first line of the board: to solve this problem, first provide
countersunk screws into the initial assembly folder address bar (Figure 1). As
previously drilled in the address bar, do not over tighten the screws, to
ensure "training". Once the clip in all of the location bar, slide to
the first plank (Figure 2). Further lines: the first line of the normal
mounting clip can now be inserted, and then after the drill hole is also
screwed (Figure 0.3). Insert the lower plate in this clip series now. Follow
corridor aisle (Figure 4).
Complete
The corresponding conclusion
You will soon end, in the installation work,
want to fix the board last line: screw - you will need longer we recommend that
you use the sink and not for 50mm, the whole length of thread milling (3.5 mm).
The first pre drilled Dielennut and the lower structure in the angle of about 45
degrees. In addition, we propose a Krauskopf to reduce the lower Pendant
Schraubenkopf.Anschlie beta end can directly screw plate. We must pay special
attention to avoid overturning screw. WPC can give a complete installation with
the diaphragm of your garden ending two options.
Install diaphragm
Cover
The opening angle:
Angular aperture
setting einendezenten framework, a list of your new courtyard floor perfect
light. You only need to be cut from the top screw hole and miter. Back drilling
materials, and to ensure that the Krauskopf countersunk screws valley. Single
lens: cut the simple initial oblique aperture. Drilling is also here to reduce
the material. Note here, simple orifice but is bolted to the slab side directly
to the substructure (Figure 1), on the longitudinal side board of the Dielennut
(Figure 2).
Daily care
No more pressure or oil
Who had ever
used the WPC covered in outdoor anyone in the know the problem of sensitive
floor coverings, must be regularly oiled or painting - and it's once again
repair damaged areas or replace all coverage is very important for low
maintenance cannot be mentioned in the same breath, environmentally friendly
WPC products. As a rule, it is simple enough to wash the floor with water. In
addition, all one to two years, it is recommended to use high-pressure cleaning
machine. For light pollution: return to the first board or tile. If there is a
need, simply rinse the dirt and wash it with water and a brush. No washing
powder needs to be thoroughly cleaned:. Just use a common high pressure
cleaner, water temperature and low attention, enough distance from the soil
surface. For stubborn stains (such as soot, metal dust, paint or varnish): this
type of patch, you only need to use wire brush to remove. Do you have the floor
or floor tile created a slight patina: no problem, the treated area, with the
rest of the surface within a few weeks of similar color.