“Third floor, seven installation”, has been the sale and installation service flooring industry is a bottleneck restricting the industry to enhance the overall level of service, it is necessary to know in advance the purchaser clear knowledge flooring installation, but also to avoid some of the late unnecessary trouble.
1. To decide to pave the flooring horizontally or vertically.
2. If it is floor heating system installation, make sure the moisture content rate of cement floor is not more than 10%, do not chisel, nail or punch the flooring.
3.Inform the installer of the places of embed pipe in case of damage.
4.The ground should be clean without dust or granule, in case that the floating grit damage the moisture proof layer.
5.The flooring should be installed in the temperature of 10℃above and relative humidity of 40%-80% . The room should be free of water seepage, leakage of rain or ground cracking.
6.drill the wedges hole for skirting board along the wall by electric drill, the height of holes should be same. Do not damage the pipes inside the wall and nail the wedges to the wall to fix it.
7. Lay the moisture proof film
Lay 0.2 thickness PE moisture proof film before paving the moisture proof underlayment. The film should be laid straightly, overlap 300mm the film in the joint places, seal and compact them by 60mm wide tape. Make 30-50mm left along the wall side but the height of film should not be higher than the skirting boards.
8.Lay the underlayment
The thickness of underlayment should not less than 2mm (3mm thickness is enough). The underlayments cannot be overlapped while installing, the joint places should be sealed and compacted by 60mm wide tape, The underlayments need to be laid straightly. Make 30-50mm high left along the wall side but the height of layment should not be higher than the skirting boards.
9.classify the flooring boards before laying. Unfold all the flooring boards before laying and classify the floorings by dark and light colors and communicate the installation plans with your clients. Use the short flooring boards first, then cut the long boards after using out the shorts.
link:http://www.leadwpc.com/know-composite-decking-installation.html